Waste treatment unit, Viotia Prefecture
Project Information
DESIGN – CONSTRUCTION OF A WASTE TREATMENT UNIT (WTU), VIOTIA PERFECTURE
Administrator of the project: Regional Solid Waste Management Organization of Central Greece
Site: Viotia Perfecture
Execution time frame: 2017-
![Waste treatment unit, Viotia Prefecture map](https://www.intrakat.gr/wp-content/uploads/static_maps/project_map_12545-1633345280.png)
![](https://www.intrakat.gr/wp-content/uploads/2018/02/DJI_0194-HDR_LQ-1024x682.jpg)
Project description
Design, Construction and Commissioning of the Solid Waste Treatment Plant for municipalities of Thiva, Aliartos and Tanagra, with total annual capacity of 35.000 t/year Municipal Solid Waste (mixed and preselected) and 7.000 t/year sewage sludge.