New Doha International Airport CP11

New Doha International Airport CP11

Project Information

The project is comprised of Hangars A and B for the Emir’s personal aircrafts, as well as an electrical substation complete with standby emergency generator. The Hangar A facility includes 2,500sq meters of offices and shops and an 18,000sq meter hangar that can accommodate up to three A-340-600s simultaneously. Hangar modules, offices and shops have been designed to maintain a 30 degrees Celsius interior temperature limit. Hangar B includes 1,000sq meters of offices and shops and an 11,000sq meter Hangar that can accommodate up to four A 321 simultaneously. The Hangars provide storage and light exterior and interior maintenance as well as minor repairs and are complete with pre conditioned air, service and jacking capabilities.

 

HANGAR A

Types of Aircrafts to be accommodated:

Airbus A340-500

Airbus A340-600

Boeing 747-100

Boeing 777-200

Boeing 777-300

Airbus A330-300

Building Dimensions: 230.00m x 80.00m

 

Total area: 19,320 sqm

Height ranges between 18m – 32m

 

HANGAR B

Types of Aircrafts to be accommodated:

Airbus A320

Airbus A321

Building Dimensions: 75.00m x 65.00m

 

Total area: 11,375 sqm

Height ranges between 12m – 25m

 

Aktor implemeted the supply, installation, testing and commissioning of electromechanical works of the project.

New Doha International Airport CP11
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

You can adjust all of your cookie settings by navigating the tabs on the left hand side.

For more information on using cookies, click here