New Doha International Airport CP11
New Doha International Airport CP11
Project Information
The project is comprised of Hangars A and B for the Emir’s personal aircrafts, as well as an electrical substation complete with standby emergency generator. The Hangar A facility includes 2,500sq meters of offices and shops and an 18,000sq meter hangar that can accommodate up to three A-340-600s simultaneously. Hangar modules, offices and shops have been designed to maintain a 30 degrees Celsius interior temperature limit. Hangar B includes 1,000sq meters of offices and shops and an 11,000sq meter Hangar that can accommodate up to four A 321 simultaneously. The Hangars provide storage and light exterior and interior maintenance as well as minor repairs and are complete with pre conditioned air, service and jacking capabilities.
HANGAR A
Types of Aircrafts to be accommodated:
Airbus A340-500
Airbus A340-600
Boeing 747-100
Boeing 777-200
Boeing 777-300
Airbus A330-300
Building Dimensions: 230.00m x 80.00m
Total area: 19,320 sqm
Height ranges between 18m – 32m
HANGAR B
Types of Aircrafts to be accommodated:
Airbus A320
Airbus A321
Building Dimensions: 75.00m x 65.00m
Total area: 11,375 sqm
Height ranges between 12m – 25m
Aktor implemeted the supply, installation, testing and commissioning of electromechanical works of the project.