“Eschatia” Stream Settlement Section 1
![](/wp-content/themes/sw_intrakat20/img/aktor-default.jpg)
“Eschatia” Stream Settlement Section 1
Project Information
The project concerns the broadening of the “Eschatia” streambed, the construction of a twin enclosed rectangular reinforced concrete culvert with dimensions (2×5.0×5.0m) and its backfilling along the length of 3km.
Aktor is the leader of the Joint Venture scheme that is responsible for the construction of the project.