6.6 MW wind park at Polykastro, Kilkis

Project Information

Design, supply of equipment and setting into operation of a 6.6 MW wind park and construction of the transmission line at Trigonometriko position, Polykastro municipal section, Kilkis prefecture.

Administrator of the project: TAFF PRIME DEVELOP TECHNICAL CONSTRUCTIONS SA

Site: Trigonometriko, Polykastro Kilkis, Northern Greece

Execution time frame: 2016

6.6 MW wind park at Polykastro, Kilkis map

Project description

Wind Park of total power 6.6 MW, consisting of two wind turbines of 3.3 MW power each and a 20km length overhead transmission line of 20KV.