Project Information

The project is comprised of Hangars A and B for the Emir’s personal aircrafts, as well as an electrical substation complete with standby emergency generator. The Hangar A facility includes 2,500sq meters of offices and shops and an 18,000sq meter hangar that can accommodate up to three A-340-600s simultaneously. Hangar modules, offices and shops have been designed to maintain a 30 degrees Celsius interior temperature limit. Hangar B includes 1,000sq meters of offices and shops and an 11,000sq meter Hangar that can accommodate up to four A 321 simultaneously. The Hangars provide storage and light exterior and interior maintenance as well as minor repairs and are complete with pre conditioned air, service and jacking capabilities.

 

HANGAR A

Types of Aircrafts to be accommodated:

Airbus A340-500

Airbus A340-600

Boeing 747-100

Boeing 777-200

Boeing 777-300

Airbus A330-300

Building Dimensions: 230.00m x 80.00m

 

Total area: 19,320 sqm

Height ranges between 18m – 32m

 

HANGAR B

Types of Aircrafts to be accommodated:

Airbus A320

Airbus A321

Building Dimensions: 75.00m x 65.00m

 

Total area: 11,375 sqm

Height ranges between 12m – 25m

 

Aktor implemeted the supply, installation, testing and commissioning of electromechanical works of the project.