New Marina at Porto Heli Ermionida
New Marina at Porto Heli Ermionida
Project Information
Marine Works
- Extension of a Breakwater 150m, by armor stone.
- New pier by concrete blocks 100m
- Special bridge by concrete piles 60m x 12m
- Dredging 120.000 m3
- Filling quarry materials 250.000 m3
Port Facilities
- Floating breakwater, all concrete 200m
- Floating Pontoons all concrete 236m
• Water, fire & sewage network system