6.6 MW wind park at Polykastro, Kilkis
Project Information
Design, supply of equipment and setting into operation of a 6.6 MW wind park and construction of the transmission line at Trigonometriko position, Polykastro municipal section, Kilkis prefecture.
Administrator of the project: TAFF PRIME DEVELOP TECHNICAL CONSTRUCTIONS SA
Site: Trigonometriko, Polykastro Kilkis, Northern Greece
Execution time frame: 2016
Project description
Wind Park of total power 6.6 MW, consisting of two wind turbines of 3.3 MW power each and a 20km length overhead transmission line of 20KV.